Reference Moeller

PROJECT/REQUIREMENTS

  • Renewal of the compressed air system for sandblasting operations
  • Compressed air requirement: 6–12 m³/min (variable operation)
  • Improvement of installation conditions
  • Optimisation of room temperature ventilation and air extraction
  • Reduction of maintenance costs
  • Energy savings
  • Heat recovery
  • Increased operational safety

SOLUTION

  • Container solution, frequency-controlled screw compressor RSF 87 D (1.59–14.33 m³/min)
  • Heat recovery (heating water)
  • Intake filtration, exhaust air via duct, summer and winter operation
  • Compressed air treatment: cyclone separator, fine filter, refrigeration dryer, sub-micro filter and activated carbon filter, oil-water separation system

IMPROVEMENT

  • Reduction of over 30% in energy costs through frequency control
  • Over 70% of the energy input can be converted into heating energy
  • Significant improvement in installation conditions thanks to container solution. This also significantly extends the service interval and thus reduces maintenance costs
  • Alternative use of the old compressor room
  • BAFA-eligible
  • Increased operational safety

     

     