Reference Moeller
PROJECT/REQUIREMENTS
- Renewal of the compressed air system for sandblasting operations
- Compressed air requirement: 6–12 m³/min (variable operation)
- Improvement of installation conditions
- Optimisation of room temperature ventilation and air extraction
- Reduction of maintenance costs
- Energy savings
- Heat recovery
- Increased operational safety
SOLUTION
- Container solution, frequency-controlled screw compressor RSF 87 D (1.59–14.33 m³/min)
- Heat recovery (heating water)
- Intake filtration, exhaust air via duct, summer and winter operation
- Compressed air treatment: cyclone separator, fine filter, refrigeration dryer, sub-micro filter and activated carbon filter, oil-water separation system
IMPROVEMENT
- Reduction of over 30% in energy costs through frequency control
- Over 70% of the energy input can be converted into heating energy
- Significant improvement in installation conditions thanks to container solution. This also significantly extends the service interval and thus reduces maintenance costs
- Alternative use of the old compressor room
- BAFA-eligible
-
Increased operational safety